• Home
  • Alerts & Actions
  • MARL (500kV)
  • Valley Link (765kV)
  • Alternatives
    • Underground HVDC
  • Landowner Resources
    • Virginia SCC
    • Loudoun County
  • More
    • FAQs
    • About
    • Subscribe
    • Contact Us
    • West Virginia
  • More
    • Home
    • Alerts & Actions
    • MARL (500kV)
    • Valley Link (765kV)
    • Alternatives
      • Underground HVDC
    • Landowner Resources
      • Virginia SCC
      • Loudoun County
    • More
      • FAQs
      • About
      • Subscribe
      • Contact Us
      • West Virginia
  • Sign In

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • Alerts & Actions
  • MARL (500kV)
  • Valley Link (765kV)
  • Alternatives
    • Underground HVDC
  • Landowner Resources
    • Virginia SCC
    • Loudoun County
  • More
    • FAQs
    • About
    • Subscribe
    • Contact Us
    • West Virginia

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

Loudoun County Virginia Data Center, Energy And Transmission Issues

Loudoun County Comprehensive Planning Transmission Corridor Land Grab

Loudoun  County  is in the process of creating a Comprehensive Plan Amendment on transmission corridors. The proposed amendments are from the Loudoun County Transportation and Land Use Committee and include adapting policies to encourage the "grouping of these tall structures within an existing and/or expanded transmission corridor right-of-way."   Loudoun County has contracted with an engineering firm (Kimley-Horn) to map all the high voltage transmission lines in the county.  This targets the property of every land owner along the existing HVAC transmission lines!!

  

Virginia is a Dillon Rule state which means a county has no authority except what the state has granted it. Loudoun County has no authority to site HVAC transmission lines or designate transmission corridors. Loudoun  County also intends to add an overlay with the transmission lines on the county map. This will have serious implications for our property values and eventually the "By Right" use of our property !


This is a power grab and a land grab on the part of the Loudoun County BOS!  It is essentially re-zoning our properties for energy infrastructure  for the data centers and is setting us up for loosing our properties by successive Eminent Domain takings piece by piece!  


Loudoun County BOS states "we don't have the authority to site the line the VA SCC does".  The fact of  the matter is they are doing this to influence / pre-empt the VA SCC to have their preferred route  proposed in advance of the application submission / hearing.  


As reported by Loudoun Now: "... the consultant recommended identifying and siting preferred transmission corridors to be considered by PJM Interconnection, the region’s power coordinator and the State Corporation Commission, which give final approval on power projects."    


The Loudoun County BOS has already decided they will NOT be intervening in the MARL (500kV) transmission line on behalf of the property owners  along the existing lines. 


From Item #4 "Resolution Opposing the Proposed Western Loudoun Route for the New 500kV Electrical Transmission line:   "FISCAL IMPACT: There are no fiscal impacts associated with adopting the Resolution.  In the event there is no change to the proposed Western Loudoun Route, then Loudoun County may need to participate in proceedings to oppose approval of the Western Loudoun Route. The County will likely incur significant expenses retaining outside counsel and experts."

  

Loudoun County BOS did not oppose the 500kV transmission line they only opposed the route that may have impacted the Waterford view shed!


Amending the plan to add transmission corridors creates two classes of property owner's  - those that will not have to worry about a transmission line on their property or in their view shed, whose properties will be PROTECTED by Loudoun County in intercession at the VA SCC using OUR tax payer funds AND those whose land will be chipped away in 200' increments to support the energy infrastructure needed to power the data centers!  Its essentially re-zoning this area for industry without any due process.


Stay engaged!! Everyone in the vicinity of the existing powerlines will need  to send comments to the Loudoun County Board Of Supervisors in opposition to the Comprehensive Plan Amendments, in order to have standing for a LAWSUIT.  If the county persists in this we will need to take them to court or risk loosing our properties entirely!

Read Loudoun County Proposed Comprehensive Plan Amendment , Transmission Report and Other Loudoun County Documents
Read LoudounNow: "Supervisors to establish preferred Corridors for Transmission Lines"

Loudoun County Planning Documents Transmission COrridors

  1. Loudoun County Board Of Supervisors Item identifying the scope of the Study 10/17/2024:
  2. Map Of the Existing HVAC Infrastructure in Loudoun County 
  3. Kimley-Horn Power Transmission Evaluation :  Kimley-Horn is the engineering firm that Loudoun County contracted with:
  4. The Section of the Loudoun County Comprehensive Plan that relates to energy infrastructure
  5. Loudoun County Energy Strategy Final Report 
  6. Loudoun County BOS Resolution:  "RESOLUTION OPPOSING NEXTERA ENERGY’S PROPOSED NEW HIGH VOLTAGE TRANSMISSION ROUTE THROUGH WESTERN LOUDOUN COUNTY AND ENCOURAGING THE USE OF EXISTING ELECTRICAL TRANSMISSION RIGHT-OF-WAY
  7. Cross Examination of Mr. Giglio from the Loudoun County Department of Planning and Zoning,  Expert Witness for Loudoun County in the Aspen- Golden Transmission line case :  PLEASE READ THIS DOCUMENT IT SPEAKS DIRECTLY TO LOUDOUN COUNTY'S TRANMISSION CORRIDOR CONCEPT / LAND GRAB 


Item9 Loudoun County Electrical Infrastructure Study 10_17_2024 (pdf)

Download

Item9 Loudoun County Electrical Infrastructure Study Loudoun Map HVAC Lines (pdf)

Download

Item9 Loudoun County Electrical Infrastructure Study KimleyHorn-Due Dilligence Report (pdf)

Download

Item9 Loudoun County Electrical Infrastructure Study-GeneralPlanChapter6 (pdf)

Download

Loudoun County Energy Strategy Final Report (pdf)

Download

Item4 Resolution Opposing Western Loudoun Line MARL Route April 2024 (pdf)

Download

VA SCC Aspen-Golden Hearing Day4-Giglio Highlighed 27pgs (pdf)

Download

LOUDOUN EXPERT WITNESS on PLAN for Transmission corridors

Cross Examination of Mr. Giglio Expert Witness for Loudoun

Cross Examination of Mr. Giglio during the Aspen- Golden Transmission line case at the Virginia SCC:

 PLEASE READ THIS DOCUMENT IT SPEAKS DIRECTLY TO LOUDOUN COUNTY'S COMPREHENSIVE PLAN TRANSMISSION CORRIDOR  LAND GRAB for Data Center Energy Infrastructure. 

Loudoun County BOS wants  to approve and site the lines and decide where they are underground themselves!

Download PDF

Copyright © 2025 Stop MARL Virginia - All Rights Reserved.

  • Home
  • Alerts & Actions
  • MARL (500kV)
  • Valley Link (765kV)
  • Neighbors
  • Subscribe
  • Contact Us
  • West Virginia

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept