• Home
  • Subscribe
  • Underground HVDC Petition
  • Action
    • How You Can Help
    • Handouts And Flyers
    • Contact Us
    • Join Us On Facebook
  • MARL/GoreDoubsGoose-500Kv
  • Valley Link-765kV
  • Virginia
  • West VA
  • Pennsylvania
  • Maryland
  • Transmission ROW Info
  • Underground HVDC
  • Electromagnitic Fields
  • FAQs
  • About
  • Allies
  • More
    • Home
    • Subscribe
    • Underground HVDC Petition
    • Action
      • How You Can Help
      • Handouts And Flyers
      • Contact Us
      • Join Us On Facebook
    • MARL/GoreDoubsGoose-500Kv
    • Valley Link-765kV
    • Virginia
    • West VA
    • Pennsylvania
    • Maryland
    • Transmission ROW Info
    • Underground HVDC
    • Electromagnitic Fields
    • FAQs
    • About
    • Allies
  • Sign In

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • Subscribe
  • Underground HVDC Petition
  • Action
    • How You Can Help
    • Handouts And Flyers
    • Contact Us
    • Join Us On Facebook
  • MARL/GoreDoubsGoose-500Kv
  • Valley Link-765kV
  • Virginia
  • West VA
  • Pennsylvania
  • Maryland
  • Transmission ROW Info
  • Underground HVDC
  • Electromagnitic Fields
  • FAQs
  • About
  • Allies

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

VIRGINIA Land Owner Resources

MARL Public Hearing Wed 9/16 6-10pm James Wood High School, GDGC application not filed as of 9/14

MARL Public Hearing Wed 9/16 6-10pm James Wood High School, GDGC application not filed as of 9/14

MARL Public Hearing Wed 9/16 6-10pm James Wood High School, GDGC application not filed as of 9/14

MARL Public Hearing Wed 9/16 6-10pm James Wood High School, GDGC application not filed as of 9/14

MARL Public Hearing Wed 9/16 6-10pm James Wood High School, GDGC application not filed as of 9/14

MARL Public Hearing Wed 9/16 6-10pm James Wood High School, GDGC application not filed as of 9/14

Sign the Petition For An Underground HVDC Solution Through Virginia for both MARL/Gore-Doubs-GooseCreek and Valley Link North


MARL Public Hearing Wednesday, September 16, 2026,  6:00 p.m. to 10:00 p.m., at James Wood High School, 161 Apple Pie Ridge Road, Winchester, Virginia 22603  (Intervenors cannot speak at the public hearing.)  PUR-2026-00018 VA SCC MARL Comment Form submit comments by December 1, 2026

Underground High-Voltage Direct Current Is An Alternative to Overhead HVAC Transmission Lines

The only viable alternative to overhead HVAC transmission lines that would preserve the value of private property, conservation easements and national and state parks affected by the MARL/Gore-Doubs-Goose Creek and Valley Link transmission lines would be underground high-voltage direct current (HVDC).  HVDC can be buried in a trench 8' x 10' within existing easements or along highways or underwater.  If new ROW is needed for an underground HVDC line it only needs 40'.  Dominion has a 185 mile entirely underground HVDC transmission line project to bring energy from the south of Virginia to the data centers in Northern Virginia.  Two Underground HVDC lines were recently energized in the North East - the Champlain Hudson Power Express and the New England Clean Power Link. Underground HVDC was investigated as an alternative at the VA SCC for the PATH 765kV line that was defeated in 2012. Read more about  Underground HVDC  If underground HVDC technology is adapted it will save thousands of private property owners from eminent domain easement takings for transmission lines to provide energy for data centers! 

Virginia Transmission Case Details

VA SCC MARL Case PUR-2026-00018 In-Progress

VA SCC Valley Link North Case TBD, Application Expected Fall 2026

VA SCC Gore-Doubs-Goose Creek Case TBD, No Application filed

Mid-Atlantic Resiliancy Link (MARL)

The MARL and  Gore-Doubs-Goose Creek applications are two segments of the same transmission line.  NextERA is proposing to take a new 200' easement for their portion of the 500kV line through West Virginia to the Gore Substation in Frederick County, VA.  NextERA will also be applying to construct a new substation (Woodside Substation) in Clearbrook, VA .

  • VA SCC Case: PUR-2026-00018 
  • Status: Active
  • See NextERA's MARL Project Map
  • VA SCC PUR-2026-00018 MARL Comment Form submit comments by December 1, 2026

Information from the Hearing Order

  • Only Property owners within 250  feet of the proposed and alternate routes will be sent notices by NextERA by May 8, 2026. NextERA is requesting a 200-foot to 500-foot siting  corridor, your property may still be impacted even if you do not receive a notice from NextERA.  
  • "The Commission may consider a route not significantly different from the routes described in this notice without additional notice to the public."
  • "NEET VA anticipates installing a total of 13 structures on the Virginia Portions of its  proposed route, with typical structure heights ranging from 115 to 190 feet tall, with an average height of approximately 150 feet and an average span length between transmission structures of approximately 1,015 feet.  The Company asserts that the entire 2.4 miles of right-of-way  ("ROW") for the Virginia Portions of the MARL Project would  require new property rights for new-build transmission line; thus, NEET VA would require new easements on 17 parcels. 
  • The Company requests that the Commission grant it the flexibility to adjust the location of its ROW within a 200-foot to 500-foot siting corridor" 
  • Under the DEA, NEET VA is obligated to complete the Woodside Substation by December 31, 2028, and  NEET VA and NEET MA are obligated to complete the overall MARL Project and place it into service by December 31, 2031. 
  • The Company maintains that PJM has requested that NEET VA and NEET MA take all  reasonable actions for obtaining approvals and completing construction of   the transmission line as soon as is practicable and closer to the  identified need date of 2027-2028.

Key Dates

1) June 8, 2026 Deadline to Intervene as a Respondent

2) Wednesday, September 16, 2026, Public Hearing 6:00 p.m. to 10:00 p.m., at James Wood High School, 161 Apple Pie Ridge Road, Winchester, Virginia 22603  (Intervenors cannot speak at the public hearing.) 

2) September 30, 2026 Deadline to file Testimony

3) December 1, 2026 Deadline for Submitting Comments  

 4) December 1, 2026 Deadline for Signing up to speak telephonically as a Public Witness at the December 15, 2026 Public Hearing 

5) December 15, 2026 Evidentiary hearing at 10:00am December 15, 2026 at the VA SCC in Richmond

VA SCC Gore-Doubs-Goose Creek Case TBD, No Application filed

VA SCC Valley Link North Case TBD, Application Expected Fall 2026

VA SCC Gore-Doubs-Goose Creek Case TBD, No Application filed

Gore-Doubs-Goose Creek 

The MARL and  Gore-Doubs-Goose Creek applications are two segments of the same transmission line.  First Energy has proposed a rebuild of the 138kV transmission line structures to a 185' pole with a new 500kV and the existing 138kV line under built for its portion of the project through Frederick, Clarke and north western Loudoun Counties

  • VA SCC Case: TBD 
  • Status: Application has not been filed
  • See FirstEnergy's Gore-Doubs-GooseCreek Project Map

Read More:

  • Preparing for the Virginia SCC Case
  • Virginia SCC Process
  • How  to Create a VA SCC Account for eFiling
  • Review Examples of VA SCC Notices of Participation and other filings
  • Annotated Example of Pro Se Notice of Participation
  • Links to Virginia SCC,  State Codes , Easement Information 

If you are intervening in either VA SCC case (MARL or Gore-Doubs-Goose Creek) be sure to include  a request for the VA SCC that if the line is not denied by Virginia, that the approval be contingent on the transmission line components being approved in all other states (Pennsylvania, West Virginia and Maryland) 

VA SCC Valley Link North Case TBD, Application Expected Fall 2026

VA SCC Valley Link North Case TBD, Application Expected Fall 2026

VA SCC Valley Link North Case TBD, Application Expected Fall 2026

Valley Link North 

This project is a 765Kv line on V-structs with guyed-wires requiring an entirely new 200' easement for its entire length. It would run from the West Virginia line through Frederick, Clarke and north western Loudoun counties to the Potomac River bordering Virginia and Maryland

  • VA SCC Docket Number: TBD 
  • Status: Application has not been filed
  • See Valley Link North Maps

Read More:

  • Preparing for the Virginia SCC Case
  • Virginia SCC Process
  • How  to Create a VA SCC Account for eFiling
  • Review Examples of VA SCC Notices of Participation and other filings
  • Annotated Example of Pro Se Notice of Participation
  • Links to Virginia SCC,  State Codes, Easement Information 




VIRGINIA STATE CORPORATION COMMISSION

Transmission Line Cases

  • NextERA Mid-Atlantic Resiliency Link (MARL) VA SCC Case :   PUR-2026-00018 , Scheduling Order,  PUR-2026-00018 MARL Comment Form submit comments by December 1, 2026
  • FirstEnergy  Gore-Doubs-GooseCreek VA SCC Case: TBD
  • Valley Link North VA SCC Case: TBD

Virginia State Corporation Commission Information

  • VA SCC Case Public Comment Forms You do not have to be on the route to submit a comment in in support of the private property owners  affected. Example: As a Private Property Owner in Virginia I oppose the use of eminent domain for transmission lines necessitated by data centers. These lines must be buried, long distance lines must be underground HVDC along highways or within existing easements. Data Centers must pay for undergrounding the transmission lines they require. 
  • VA SCC Daily Filings List
  • VA SCC eFiling Login for Uploading Documents to Cases
  • VA SCC eFiling How To and Authorization Form for Pro - Se Respondents
  • VA SCC eFiling Guidlines
  • VA SCC  eFiling User's Guide
  • VA SCC Participating in Cases As A Public Witness
  • VA SCC Participating in Webcasts
  • VA SCC  List of Cases  Scheduled for Remote Public Hearing  & Signup Form 
  • VA SCC Docket Search
  • VA SCC Home Page
  • How  to Create a VA SCC Account for eFiling
  • Review Examples of VA SCC Notices of Participation and other filings
  • VA SCC Transmission Line Case List useful for looking at filings in other cases to use as examples or templates for pro - se intervenors

Virginia Additional Information

  • The Code of Virginia: Title 56 Section 56-259. Rights Of Way
  • The Code Of Virginia Title 25.1 Eminent Domain
  • Virginia Farm Bureau Eminent Domain Fact Sheet
  • Real Estate Law Journal (Discussion /History): "Eminent Domain Reform: The "Virginia Way"
  • Institute For Justice On VA Eminent Domain Laws  
  • Easement Information
  • Property Value Impacts

Please review the Easement Information and read how property owners in West Virginia were treated by the land agents in the TrAIL and PATH cases. Don't be taken advantage of!


Prepare for the Virginia SCC Case

Intervening in the VA SCC case is the only way to protect your property rights and have standing for appealing the VA SCC decision to the  Virginia Supreme Court. 


Individuals can intervene "Pro Se" at the Virginia SCC to represent themselves and their property interests. You do not need a lawyer! You also do not have to travel to Richmond for the hearing you can participate remotely by webcast (you will have to submit a motion to appear remotely which the VA SCC would then need to approve).  

  • Businesses and HOAs must be represented by a lawyer.  
  • Multiple property owners can pool their resources and hire a single lawyer to represent them all. 

We are not lawyers and this is not legal advice this is information on how you can file Pro-Se. We suggest property owners, who have property that could be taken for easements by eminent domain contact a lawyer. 


If you want to intervene "Pro Se" and have not already requested a Virginia SCC efiling account please do so ASAP so you will be ready to file as soon as the application is filed! 


You can review several examples of Notices Of Participation filed in prior and current VA SCC cases, or use the VA SCC Docket Search to lookup other example filings.


Once you receive the email that your account has been created you only have 72 hours to click the link and set the password, set your password right away! Last step,  verify you can login to the Virginia SCC site (here).


If the link to your e-filing account expires before you set the password you will need to call the VA SCC Office Of the Clerk at 804-371-9838. Their in-person hours are 8:30 am - 10:30 am Monday - Friday.


Read More:

  • Virginia SCC Process
  • How  to Create a VA SCC Account for eFiling
  • Review Examples of VA SCC Notices of Participation and other filings
  • Annotated Example of Pro Se Notice of Participation

Virginia SCC Case efiling System Authorization Form

 The Virginia SCC requires a paper form to be mailed in in order for you to intervene or upload comments to the case electronically. 

  • Intervening in the VA SCC case is the only way to have standing in appeals of the SCC decision to protect your property rights 
  • You can intervene in the docket and / or send comments, regardless of whether your property is directly affected or not 
  • You don't need a lawyer to intervene.  Intervening and representing yourself is called "Pro Se" ,  intervening will give you standing if the case is appealed of the case to the Virginia Supreme Court
  • You don't have to travel to Richmond to participate as the Virginia SCC has remote participation capabilities and  provides audio and video capabilities for hearings within its courtrooms (if you are a respondent you will need to file a motion to request to be able to participate remotely, if you are not able to travel to Richmond for the hearing).  
  • Importantly, when participating as a respondent, you can ask questions of the energy companies and when speaking during the case  there is no time limit on your testimony!
  • To apply for an account at the VA SCC go here:   https://scc.virginia.gov/clk/efiling/DocFile.aspx 
  • Choose either the Word  format or the PDF format to fill out, print and mail to the VA SCC address on the form or download the form below and follow the instructions 
  • The VA SCC will send an email confirmation message with a link to set your password.  Watch for the email - you will have only 72 hours to set a password on your account before the link expires!
  • If the link to your e-filing account expires before you set the password you will need to call the VA SCC Office Of the Clerk at 804-371-9838. Their in-person hours are 8:30 am - 10:30 am Monday - Friday.

Download VA SCC Case eFiling Authorization Form PDF

VIRGINIA SCC EXAMPLE FILINGS And Orders

Example Participant Filings

Links to documents filed in two recent VA SCC cases (PUR-2025-00056 Golden-Mars and PUR-2024-00032/PUR-2024-00044 Aspen-Golden). Both of these cases had 500kV lines for the data centers in Loudoun County's Data Center Alley. 


Example Notices of Participation 

  • Golden-Mars LVE1 HOA Notice Of Participation
  • Aspen-Golden Business Owner Notice Of Participation
  • Golden-Mars Ratepayer/Consumer Pro Se
  • PATH Pro-Se Notice Of Participation
  • Virginia Pro-Se Notice Of Participation Annotated Sample 


Examples of Direct Testimony

  • Golden-Mars Direct Testimony of a Homeowner
  • Golden-Mars Direct Testimony of an HOA President
  • Aspen-Golden Direct Testimony of a Business Owner 
  • Golden-Mars Direct Testimony Protect The Broad Run Stream (Environment)
  • Golden-Mars Direct Testimony Opposing Cost, Eminent Domain takings and proposing underground HVDC


Examples Of Expert Witness Testimony (hired experts)

  • PATH Expert Witness on EMFs - 765kV 
  • Golden-Mars Expert Witness testimony on EMFs - 500kV conductor configuration
  •  Golden Mars Expert Witness Testimony proposing an underground 500kV segment based on Chino Hills

Other

  • The Hearing Examiner will issue an Order for Notice and Hearing to set the schedule for the case Example: Golden-Mars Hearing Order
  • All public documents in the Golden-Mars Case (PUR-2025-00056)
  • All public documents in the Aspen-Golden Case (PUR-2024-00032, PUR-2024-00044)


Virginia SCC Example Pro Se Notice Of Participation

Below are 2 Documents from the 2009 PATH 765kV transmission case. 2009 was the last time a 765kV transmission line was proposed for our area, similarly no 500kV transmission lines have been proposed since then either.  The first is the template we used, annotated with comments, and the second is the Notice Of Participation of one of the property owners who filed to intervene  Pro Se in the PATH Case 

Template_VA_SCC_NoticeOfParticipation_WithUpdateComments (docx)Download
2009_0724_PUE-2009-00043-PATH_PropertyOwner_NoticeOfParticipation (pdf)Download

VA SCC Pro Se NOTICE OF PARTICIPATION - ANNOTATED EXAMPLE

Download PDF

Copyright © 2026 Stop MARL Virginia /  Stop Valley Link - All Rights Reserved.

  • Home
  • Subscribe
  • Contact Us
  • Underground HVDC
  • Electromagnitic Fields
  • FAQs
  • About
  • Neighbors

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept